|
Product Details:
Payment & Shipping Terms:
|
| Category: | Engine Parts | Machine Model: | DX210W DX225LC |
|---|---|---|---|
| Appliion: | Excavator | Product Name: | Water Pump |
| Part Number: | 65.06500-6178A 65.065006178A | Packing: | Standard Export Carton |
| Highlight: | Doosan excavator water pump,DX210W water pump replacement,DX225LC excavator spare parts |
||
| Name | Water Pump |
| Parts No | 65.06500-6178A 65.065006178A |
| Machine Model | DX210W DX225LC |
| Category | Engine Parts |
| Lead time | 1-3 DAYS |
| Quality | Brand new, OEM quality |
| MOQ | 1 PCS |
| Means of transport | By sea/air, DHL FEDEX UPS TNT EMS |
| Packing | As request or standard packing |
| Drives coolant flow through the engine block, cylinder head, and radiator |
| Regulates heat from combustion and friction |
| Ensures consistent temperature for optimal performance, fuel efficiency, and durability |
| Protects critical parts (pistons, valves, bearings) from thermal failure |
| Excavators: DH220-3, DH220-5, SOLAR 220LC-V, SOLAR 225LC-V |
| Wheel Loaders: Compatible Doosan loader models with D1146 engines |
| Other: Doosan/Daewoo construction and industrial equipment using D1146-series engines |
| 65.06500-6389 WATER PUMP ASS'Y |
| Doosan |
| 65.06500-6085 WATER PUMP ASS'Y |
| Doosan |
| 65.06500-6174C WATER PUMP ASS |
| Doosan |
| 65.06500-6174A WATER PUMP ASS |
| Doosan |
| 65.06500-6174 WATER PUMP ASS |
| Doosan |
| 2.241-00083 WATER PUMP ASS'Y |
| Doosan |
| 65.06500-6138B WATER PUMP ASS'Y |
| Doosan |
| 65.06500-6137 WATER PUMP ASS'Y |
| Doosan |
| K9004707 WATER PUMP ASS'Y |
| Doosan |
| Pos. | Part No | Qty | Parts name | Comments |
| 1 | 400921-00008 | [1] | WATER PUMP ASS`Y | |
| 1 | 65.06500-6271A | [1] | WATER PUMP ASS'Y | 400921-00008 |
| 1 | 65.06500-6178A | [1] | WATER PUMP ASS'Y | 65.06500-6178B |
| 1 | 65.06500-6178B | [1] | WATER PUMP ASS'Y | 65.06500-6271A |
| 1A. | 65.06501-0099 | [1] | HOUSING;WATER PUMP | |
| 1A. | 65.06501-0099A | [1] | HOUSING;WATER PUMP | |
| 1A. | 65.06501-0300 | [1] | . HOUSING;WATER PUMP | |
| 1B. | 65.06520-6007 | [1] | . SEAL;MECHANICAL | |
| 1B. | 65.06520-6008 | [1] | . SEAL;MECHANICAL | |
| 1C. | 65.93410-0087 | [1] | . BEARING | |
| 1C. | 65.93410-0027 | [1] | BEARING | 65.93410-0087 |
| 1D. | 06.29020-0132 | [1] | . SNAP RING | |
| 1E. | 65.06504-0033 | [1] | . HUB;V-BELT PULLEY | |
| 1F. | 400902-00004 | [1] | . IMPELLER;WATER PUMP | |
| 1F. | 65.06506-0029 | [1] | IMPELLER;WATER PUMP | 65.06506-0029A |
| 1F. | 65.06506-0029A | [1] | IMPELLER;WATER PUMP | |
| 1F. | 65.06506-0032 | [1] | IMPELLER;WATER PUMP | 400902-00004 |
| 2 | 65.06503-0113 | [1] | PULLEY;V-BELT | |
| 3 | 65.06901-0042 | [1] | GASKET;WATER PUMP | |
| 4 | 06.01913-3120 | [5] | BOLT ASS`Y M8X45 | |
| 5 | 06.01913-3121 | [2] | BOLT ASS`Y M8X50 | |
| 6 | 420211-00166 | [1] | PIPE,COOLING WATER | 420211-00480A |
| 6 | 420211-00480A | [1] | PIPE,COOLING WATER | |
| 6 | 65.06301-0258A | [1] | PIPE;COOLING WATER | |
| 7 | 65.06903-0029 | [1] | GASKET;WATER PIPE | |
| 8 | 06.01913-3117 | [2] | BOLT ASS`Y M8X30 |
![]()
1 Hydraulic parts: hydraulic pump, main valve, hydraulic cylinder, final drive, travel motor, swing machinery, swing motor etc.
2 Engine parts: engine ass’y, piston, piston ring, cylinder block, cylinder head, crankshaft, turbocharger, fuel injection pump, starting motor and alternator etc.
3 Undercarriage part: Track roller, Carrier roller, Track Link, Track shoe, Sprocket, Idler and Idler cushion etc.
4 Cab parts: operator’s cab, wiring harness, monitor, controller, seat, door etc.
5 Cooling parts: Radiator, air conditioner, compressor, after cooler etc.
6 Other parts: Service kit, swing circle, engine hood, swing joint, fuel tank, filter, boom, arm, bucket etc.
Advantage
1. Offer Top quality & competitive products
2. Support 12-month warranty
3. 100% tested before shipping
4. Delivery in time
5. A wide range of Oil Pressure Sensor, Fuel Tank Level Sensor, Temperature Sensor, Speed Sensor for excavator
6. More than 15 years production and 11 years foreign trade experience
7. Professional QC team
8. Best sales team, 24 hours service
Packing Details :
inner packing : plastic film for wrapping
external packing : wooden
Shipping :
within 3 days after received the payment , by air or by express or by sea on the basis of the
quantity and emergency circumstances.
1. By Couriers: DHL, UPS, FEDEX, TNT are the main courier companies we are cooperated,
2. By Air: Delivery from the Guangzhou air port to customer's destination city air port.
3. By Sea: Delivery from the Huangpu port .
Contact Person: Mr. Paul
Tel: 0086-15920526889
Fax: +86-20-89855265